Tunisia and Pakistan: Eni Accelerates The Shift To Decarbonization By Setting Up New Plants
12 Mar 2019

The Pakistan plant will be built in close proximity to the Bhit gas field at which Eni is the operator with a 40% stake, through its subsidiary Eni New Energy Pakistan. The Tunisia plant will be built at the ADAM oil concession, at which Eni is the operator with a 25% stake, through its subsidiary Eni Tunisia BV. 

Read more.