Roof Top Solar Projects
  • The project consists of rooftop PV installs on 400 low-income households with a total capacity of 600 kWp and individual capacities ranging from 1kWp to 2 kWp installations
  • The project, which is co-funded by Mercy Corps and the Jordanian Ministry of Energy and Mineral Resources’ Fund for Renewable Energy & energy Efficiency (JREEEF), is being implemented in its totality by MASE, a full-service power systems provider.
  • The project will result directly in capacity building, lowering or eliminate the electricity cost on up to 400 families (up to 1000 individuals)